Laserfiche WebLink
Marty Block <br /> Excel Energy <br /> 16805 WCR 19 'h <br /> Platteville, Co 80651 <br /> Western Mutual Ditch Company <br /> Note: The Division of Minerals and Geology ("Division") shall not be a party, but shall <br /> participate in the hearing as staff to the Board. <br /> III. ISSUES TO BE CONSIDERED <br /> Presentations to the Board shall be strictly limited to the issue of whether the pending application <br /> complies with the;requirements of the Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials, Sections 34-32.5-101 et se ., C.R.S. ("Construction Materials Act"), and <br /> the rules and regulations promulgated by the Board. The parties shall limit presentations to the <br /> question of whether the pending application should be approved or denied, based on the issues <br /> stated below. <br /> 1. Reclamation:plan with respect to environmental protection of surface water run-on, run-off, <br /> discharge, and goals and expectations. (Michael Decker) <br /> 2. Potential impacts from mining operation to adjacent landowners domestic wells, irrigation <br /> wells, irrigation ditches and alluvial groundwater used for subirrigation. (Kathryn A. Hardin; <br /> Michael Ptasnik; Scott, Brochard, Depratt, Odenbaugh, Reinick& Rippe; Michael Decker; <br /> Beth Decker; Western Mutual Ditch Company) <br /> 3. Presence of wetlands, necessary mitigation and need for 404 Permit. (Michael Ptasnik; and <br /> Scott, Brochard, Depratt, Odenbaugh, Reinick& Rippe) <br /> 4. 100 year flood plain analysis, mitigation and set back requirements (Michael Ptasnik; Scott, <br /> Brochard, Depratt, Odenbaugh, Reinick& Rippe) <br /> 5. Evaporative loss from the reclaimed lake surface and water augmentation plan(Scott, <br /> Brochard, Depratt, Odenbaugh, Reinick& Rippe) <br /> 6. Containment and disposal plan for mine and plant generated chemicals and other by- <br /> products. (Scott, Brochard, Depratt, Odenbaugh, Reinick& Rippe) <br /> 7. Potential wildlife habitat loss and delineation of buffer zones to protect eagle roost habitat. <br /> (Michael Ptasnik) <br /> 8. Reclamation cost estimate, consideration of what structures were considered. ( Scott, <br /> Brochard, Depratt, Odenbaugh, Reinick & Rippe) <br /> 3 <br />