My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-14_REPORT - C1981020
>
Day Forward
>
Report
>
Coal
>
C1981020
>
2008-02-14_REPORT - C1981020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:50 PM
Creation date
2/15/2008 9:53:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
REPORT
Doc Date
2/14/2008
Doc Name
2007 Annual Reclamation Report
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Annual Reclamation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year_ 2007 _ <br />Munger Cannon Mine _ C-81_0_20 ___ C_AM_MINING, LL_C _ <br />mine name permit # ~ Permittee <br />Address: 3148 Highway 139, P.O. Box 98, Loma CO 81524 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 19.5 + 1.3 = 20.8 <br />Acres backfilled and raded 4.5 + 14.0 = 18.5 <br />Acres to soiled 4.5 + 12.7 = 17.2 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br />Acres seeded* 4.5 + 12.7 = 17.2 = 17.2 + -0- <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine. the total number of acres disturbed 20.8 <br />Phase (released -0- Phase II released -0- <br />For Mines in Permanent Cessation: <br />and the total number of acres: <br />Phase III released -0- <br />Total acreage in facilities subject to reclamation but yet to be completed _?~3 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2. <br />2.3 <br />Acreage in active mining areas 3. <br />'(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />s Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />
The URL can be used to link to this page
Your browser does not support the video tag.