Laserfiche WebLink
Terry Tunnel, general labor <br />Task <br />Whirlwind Bulkhead, General labor @ $ 26.91 per hr. <br />Subtotal Labor, includes overhead and profit <br />Add 5% DRMS administration required by statute <br />Labor Component of Bulkhead Bond <br />40 hrs. <br />Terry Tunnel Hours Factor <br />40 0.65 hrJhr <br />$ 699.68 <br />Subtotal 3 699.68 <br />$ 26.503.41 <br />$ 1.325.17 <br />Subtotal <br />ost Item Quantit Extended Cost <br />Terry Tunnel <br />' Sand Blaster $ 20.00 per day 3 days <br />' Non-shrink grout, 1-bag $ 10.16 per bag 1 bag <br />' Sand blaster sand, 30# grit, 100 Ib. bag $ 7.36 per bag 3 bag <br /> Terry Tunnel price Terry Tun nel quantity Price Factor Size Factor <br />Whirlwind Bulkhead <br />' <br />$ 20 <br />00 <br />per day <br />3 <br />days <br />1.5 0.21 $ 18.90 <br />Sand Blaster . b 24 <br />5 $ 15 <br />1 <br />'Non-shrink grout. 1-bag $ 10.16 per bag 1 ag . <br />. <br />'Sand blaster sand. 30# grit. 100 Ib. bag $ 7.36 per bag 1 bag 1.5 $ 11.04 <br /> Subtotal 3 45.18 <br />Terry Tunnel <br />' 8"x8"x16' timbers $ 2,196.00 each <br />' 2"x6"x14' timbers $ 381.00 each <br />' 2"x12"x14' timbers $ 150.00 each <br />' 8" DRISCO pipe w/ flanges $ 420.00 each <br />'#9rebar $ 928.00 each <br />' #6 rebar $ 128.00 each <br />' Concrete Block (pipe support) $ 252.00 each <br />' 6" stainless bypass pipe $ 2.250.00 each <br />' 1" stainless monitoring pipe $ 618.00 each <br />' 6" stainless gate valve $ 3,986.00 each <br />' Miscellaneous bolt packages and gaskets $ 155.00 each <br />' Freight $ 200.00 each <br />