Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial inspection conducted by Jason Musick of the Colorado Division of Reclamation, <br /> Mining, and Safety. The final Phase III bond release application for the Golden Eagle Mine is pending <br /> for the majority of the reclaimed areas at this site. Weather conditions were clear and cold at the time <br /> of the inspection. Ground conditions were snow covered throughout the site at the time of the <br /> inspection. <br /> Revegetation <br /> The ground was covered throughout by recent snowfall. Although snow cover was substantial, <br /> noticeable vegetation cover was observed throughout the reclaimed areas. Good vegetation <br /> throughout the reclaimed portions of this site was noticeable despite the snow cover on the site. No <br /> revegetation problems or inadequate vegetation were noted at the time of the inspection. <br /> Reclamation Success <br /> There did not appear to be any evident problems on reclaimed areas throughout the site. The <br /> reclaimed ponds appeared in compliance and no problems were noted. Good vegetation was <br /> noticeable throughout the site. The main facilities area appeared to be in good condition and what <br /> appeared to be good vegetation growth throughout. <br /> Overall, this site is appeared to be in good condition for the winter season. <br />