Laserfiche WebLink
RECLAMATION COST ESTIMATE <br />The following Reclamation Cost estimate is based on the <br />assumption that there will be no more than 8.67 acres ± distur- <br />bance at any one time. The mine working face will be shaped as <br />mining progresses so no additions reclamation will be needed <br />except to seed the flat bench of each level. When it comes time <br />to resoil the area, an average of 1.50 inches of soil will be <br />spread over the disturbed area. At that time we will have to <br />respread 12,127 cubic yards of topsoil and move 1,692 cy of <br />cutMill sloping. No sloping will be necessary on the exterior <br />slopes as they will be done as mining progresses. The table <br />below outlines the various areas of disturbance at the time <br />explained above. A D8N is used to do the shaping and resoiling <br />in this calculation and the mobilization haul distance is 10 <br />miles from Kremmling. The revegetation cost figure used includes <br />fertilizer, grass seed, mulch, labor and drilling costs. <br />STAGE TOTAL SOIL DEPTH <br />NEEDING REBOILING 9.02 1.50 <br />REVEGETATION AREA 9.02 <br />REBOIL @ 1 .5~~ 1 ,B1 9 CUBIC YARDS <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />Unit Cost <br />1. Revegetation areas includes grass seed, fertilizer <br />fiber mulch and labor to hydromulch <br />2. Re-spreading soil and/or growth media with <br />D-8 cat push distance 350 ft or less <br />RECLAMATION COSTS <br />1. Revegetation, 9.02 ac <br />la. Secondary revegetation <br />2. Recoiling, 1,819 yd3 <br />5. Indirect costs <br />Mobilization <br />Insurance, Bond, & <br />6. Administration costs <br />$750.00/ac <br />9.02 ac ~ 330 * $750.00/ac <br />1.12 swell = 2,037 * 52~/yd3 <br />Net Total <br />Profit <br />TOTAL ESTIMATE <br />Recommend bond be set at $13,000.00 <br />$ 750.00/AC. <br />$ 0.52/YDa 1~ <br />$6,502.50 <br />2,145.83 <br />1,059.39 <br />$9,707.72 <br />829.66 <br />1,210.04 <br />966.10 <br />$12,713.52 <br />to <br />