My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-06_PERMIT FILE - M2007044 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2007044
>
2008-02-06_PERMIT FILE - M2007044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:19 PM
Creation date
2/11/2008 8:02:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
PERMIT FILE
Doc Date
2/6/2008
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Energy Fuels Resources
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinq Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task #: 05p State : Colorado Permit/job #:M-2007-044 <br />Date : 0210512008 County :Mesa Abbreviation :none <br />User : GRM Site: Whirlwind Mine Filename :M044-05p <br />Agency or organization name: DRMS <br />Permit or other job action :Initial Reclamation Liabilty Estimate <br />Task description :spread available topsoil over <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 318C L <br />Horsepower : 125 <br />Weight (MT) : 19.64 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour: $23.16 NA Shiftbasis : 1 per day <br />Operating cost/hour : $33.89 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $90.01 Total fleet cost/hour : $90.01 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 672 CCY factor : 1.125 volume : 756 LCY <br /> <br />Source of estimated volume :reclamtion plans <br />Source of estimated swell factor :na <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.93 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 1.05 Moist loam or sandy clay (100% - 110%) _ <br />Adjusted bucket capacity : 0.98 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,800 feet Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shif 1day) <br />Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 207.77 LCY/hour <br />Adjusted hourly unit production : 172.45 LCY/hour <br />Adjusted hourly fleet production : 172.45 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 4.38 hours <br />Unit cost : $0.522 per LCY Total job cost : $395 <br />
The URL can be used to link to this page
Your browser does not support the video tag.