Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name: DRMS <br />Task # : MB1 State :Colorado Permit/job #: M-2007-044 <br />Date : 0210512008 County :Mesa Abbreviation :none _ <br />User: GRM Site :Whirlwind Mine Filename :M044-MB1 <br />Permit or other job action :Initial Reclamation Liability Estimate <br />Task description :Initial Mobilization to site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Cost Breakdown <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D8R Series ll - 8U (200 53.17 $50.59 $125.45 1 $176.04 $125.45 $0.00 <br />-Cat 318C L 21.66 $23.16 $88.67 1 $111.83 $88.67 $0.00 <br />-CAT 938G (2003) 14.45 $16.13 $88.67 1 $104.80 $88.67 $0.00 <br />-CAT 246 (2004) 3.58 $5.55 $88.67 1 $94.22 $88.67 $0.00 <br />-reveg equipment 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $600.56 $480.13 $0.00 <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45