My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-16_APPLICATION CORRESPONDENCE - C2008086 (3)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2008086
>
2008-01-16_APPLICATION CORRESPONDENCE - C2008086 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:02 PM
Creation date
2/7/2008 3:18:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2008086
IBM Index Class Name
Application Correspondence
Doc Date
1/16/2008
Doc Name
Preliminary Draft Environmental Impact Statement/Subsidence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br />LIST OF FIGURES <br />(See EIS Figure Volume) <br />Figure No. Title Page <br /> <br />1 Red Cliff Mine Project and Coal Lease Areas ........................ 47 <br />2 Plan View of Three Adjacent Longwall Panels ....................... 48 <br />3 Estimated Gateroad Pillar Loads From Mining First Adjacent <br /> Panel ..................................................... 49 <br />4 Load Transfer Distance Data ..................................... 50 <br />5 Estimated Gateroad Pillar Loads From Mining Second Adjacent <br /> Panel ..................................................... 51 <br />6 McClane Canyon Mine Workings .................................. 52 <br />7 Subsidence Predicted for Five Selected Panels, McClane Canyon Mine.. 53 <br />8 Subsidence Over Room-And-Pillar Workings After Pillar Failure........ 54 <br />9 Localized Mining Induced Slope Angle Changes ..................... 55 <br />10 Potential Collapse Heights Above Different Mine Opening <br /> Geometries ................................................ 56 <br />11 Cumulative Percent of Chimney Collapse Height .................... 57 <br />12 Time Interval Between Mining and Surface Breached or Dropped....... 58 <br />13 Overburden and Outcrop Map for the Project Area ................... 59 <br />14 Estimated Angle of Draw in Relation to Percent Sandstone and <br /> Limestone ................................................. 60 <br />15 Cross Panel Compression Ridge in Alluvium, York Canyon Mine....... 61 <br />16 Cross Panel Tension Cracks in Alluvium, York Canyon Mine .......... 62 <br />17 Ribside Tension Crack On Steep Slope, York Canyon Mine............ 63 <br />18 Ribside Tension Cracks in Road Fill and Cliff Face, York Canyon <br /> Mine ...................................................... 64 <br />19 Maximum Vertical Subsidence (SmeX) With Respect to Panel Width <br /> and Depth .................................................. 65 <br />20 Tension Crack Over Starter Room, York Canyon Mine ................ 66 <br />21 Subsidence Monitoring Program .................................. 67 <br />These figures are included in the attached EIS figure volume. <br />Page 3 of 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.