Laserfiche WebLink
-4- <br />12. Prirr~arv future (Post-mining) land use (check one): <br />Cropland(CR) X Pastweland(PL) <br />Rangeland(RL) Forestry{FR) <br />_____ Residential(RS) Recreation(RC) <br />X Developed Water Resowces(WR) <br />General Agricultwe(GA) <br />Wildlife Habitat(WL) <br />Indus triaUCommercial(IC) <br />_ Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />__ Croptand(CR) Fastweland(PL) <br />Rangelar-d(RI-) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resowces(WR) <br />X General Agricultwe(GA) <br />_., Wildlife Habitat(WL) <br />__ Industriab'Commercial(IC) <br />14. Method of Mining: Briefly explain mining rrs;thod (e.g, hucklshovel): Dry mining technicTUes using scrapers <br />front-end loaders and back hoes to remove a re ate. <br />15. On Site Processing: ~_ Crushing/Screening <br />13.1 Ariefly explain mining method (e.g, tnzck/shovel): The material will be loaded by front-end loader <br />ont_~nvevor system and transferred to the crushinq,/screening/washing facility <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion: <br />None <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />