Laserfiche WebLink
<br /> <br /> <br />APPENDIX M(vii) <br />MUNGER CANYON MINE <br />COAL MINE WASTE DISPOSAL SITE <br />INTERIM CONFIGURATION -RECLAIMED WITH. SEDIMENT POND IN PLACE <br />Notes for Calculations: <br />1. Pages M(vii)-27 & 28 present a spread sheet calculation of the required <br />capacity of the sediment pond based on the 10 year event. <br />2. Page M(vii)-29 is a ditch and culvert sizing summary. <br />3. CMP 1, 2 and 3 are shown on Figure 2.2-6. Design forCMP-1 is shown on <br />page 35-i. Design for CMP-2 is shown on page 56-i. Design for CMP-3 begins <br />on page 37-i. <br />4. Ditches were sized using SEDCAD4. Ditches were sized using the 10 year <br />and 100 year event as appropriate. Ditches C, D, F, I and J were sized with the <br />100-year event, Ditches K and L were sized with the 10 year event. <br />5. Page M(vii)-48 shows the peak flow using the 25-year event in the SEDCAD4 <br />program. This peak flow is for the interim configuration. The original emergency <br />spillway design utilizes a 21"diameter and is shown on page M(vii)-30. <br />6. A berm will divert surface run-off away from the southern and western edges <br />of the sediment pond. <br />ENGINEER'S CERTIFICATION <br />The calculations and information presented on pates M(vii~26 through M(vii)-48 <br />were prepared under my direct supervision during the month of December, 2007 <br />and the information present~d~;~I:u;~nd,.con'ect to the best of my knowledge <br />and belief. ~~~ <br />Jarrr~A$tover,,d''~o Date <br />Register`~q~p~pd~',rofessional Engineer <br />State o~~~'orado, No. 19230 <br />TR-23 <br />M(vii)-26 <br />12/07 <br />