Laserfiche WebLink
TABLE 3.9 - 5 Culvert Removal and Stream Channel Reconstruction <br />MUNGER CREEK 72 INCH CULVERT <br />Design the channel to pass the flow from a 100YR 24HR event <br />The calculations of flow for Q100 are from Appendix M(v) <br />Given: Event - 100 year 24 hour Q100 = 431 cfs <br />Slope of channel = 0.504'0 <br />Soil type = Alluvial Silt Noncolloidal <br />Maximum Velocity (fps) = 5 <br />Trapezoidal Ditch Dimensions: <br />Depth = d = (feet) 3.5 <br />Base = b = (feet) 8 <br />Side Slopes = z = 5.00 <br />Manning No. = n = 0.035 <br />Area of flow = A = <br />bd +zd2 = <br />89.25 <br />Hyd. Radius = R = <br /> <br />bd +zd2 / b + 2d(z2 + 1)0.5 <br />R = 2.0427 <br />Velocity of flow = V = 1.49/n * R0.667 * S0.5 <br />Quantity of Flow = Q = A * V <br />V = 4.8462 <br />Q = 432.523 <br />ROAD <br />z=5h:1V <br />OVERALL CHANNEL DEPTH WILL BE 8 FEET TO CREATE FORD <br />MU VOL 1 PAGE - 1 11 - 30 - 96 <br />