Laserfiche WebLink
<br />Table 3.9-1LOMA LOADOUT REVEGETATION Task 20 <br />The loadout will be vegetated with the temporary revegetation mix to minimize erosion and <br />sedimentation. The loadout must remain in a condition that will allow future use of the area <br />as a rail loading facility per terms of the lease wrththe railroad. <br />DRILL $F~DI <br />AREA TO BE <br /> <br />i• <br />TASK DESCRIPTION - <br />TILLING/SEEDBED PREPARATION <br />ATED <br />TOTAL <br />2.98 ACRES <br />Scarify, harrow, seed, mulch, crimp, and <br />fertilize as necessary in second season <br />2.98 ACRES <br />METHOD : Chi I plowing $53.95 per acre <br /> Harro -ng $96.80 per acre <br />SEEDING METHOD : Drill $60.23 per acre <br /> PLS/A $J# $/acre <br />Western Wheat Grass 5 4.81 $24.05 <br />Thiskspike Wheat Grass 10 2.55 $25.50 <br />Streambank Wheat Grass 5 1.79 $8.95 <br />SEED RATE 20 p /acre $58.50 per acre <br />MULCHING <br />MATERIAL Native hay or stra <br />MULCH RATE 2 <br />COST $/TON $110,00 $220.00 per acre <br />SPREADING RATE 2 ton/a re $60.11 per acre <br />CRIMPING $41.41 per acre <br />FERTILIZING <br />AREA TO BE COVERED <br />MATERIAL USED <br />RATE OF COVERAGE <br />APPLICATION METHOD <br />2.98 acres <br />10/20/10 at <br />250 Ib per <br />TRACTOR BROADCAST <br />DRILL SEEDING COST 2.98 ACRES <br />INITIAL DRILL SEEDING COST <br />REESEEDING ASSUME 25% FAILUI <br />TOTAL LOMA LOADOUT SEEDING COST <br />Mu Vol I <br />Page - 21 <br />b % OF AREA) <br />$6.50 per 50 4b bag <br />$32.50 per acre <br />$21.00 per acre <br />$644.50 per acre <br />$1,923.44 <br />$480.86 <br />$2,404.30 <br />8/30/96 <br />