My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-24_PERMIT FILE - C1981020A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981020A
>
2008-01-24_PERMIT FILE - C1981020A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:26 PM
Creation date
2/7/2008 10:28:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
1/24/2008
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 3.9-1 LOMA LOADOUT -TRUCK COAL TO MINE SITE <br />TASK DESCRIPTION Haul coal and coaly material at the loadout to the mine. <br />P View <br />21' 13' <br />125 <br />Cross Section <br />7' <br />5' <br />Task 15 <br />'U r <br />Coal ramps are cons ted of a core of gravel covered with a cap of coal about one <br />foot thick. The dimensio of the ramps is 60' by 40 feet. Gravel exposed after the coal <br />has been removed will be read along the siding to provide a firm base for siding users. <br />MATERIAL QUANTITIES <br />Length dth Height cU-yd tons <br />Coal Pile 125 1 6 236 354 <br />Coal/Dirt on pad 400 60 0.25 222 333 <br />Ramps - 3 60 40 1 89 133 <br /> TOTAL 547 821 <br />TRUCKING COST <br />From "WesTran" Bid 2.95 <br />~ (2.5 days for Project) <br />Two trucks used ~ about 25 tons per truck <br />time is about 4 minutes a thick and the total <br />LOADING COST <br />980 CAT loader with Operator <br />Total $2,421.46 <br />requiring about 40 trips. The loading <br />ng time will be about 2 hours. <br />Per Hour <br />The loader will be stockpiling the coal between cks and will also be used to remove <br />gravel from the ramps and distrubute it over the rea next to the tracks. The loader will <br />also be used to finish grade the area by back dra ing the surface after the coal has <br />been removed. No Grader will be needed for fina grading. There will be about <br />2.25 days waiting time for the loader to accompl sh the tasks. <br />Loading Cost ~ <br />JOB COST <br />TOTAL MATERIAL 821 <br />TOTAL TRUCKING COST $2,421.46 <br />COST PER UNIT VOLUME $8.811 <br />per hour $2,400.00 <br />AL JOB COST $4,821.46 <br />Mu Vol I Page - 17 11/29/96 <br />