Laserfiche WebLink
TABLE 3.9-1 -STRUCTURAL DEMOLITION TASK 12 <br />All material on the mine site must be removed prior to or in conjunction with the regrading of the <br />and road. The following calculations are based on loading each item or group of items on a <br />truck hauling it to a disposal facility. The time to truck each item is calculated below and is <br />is based u an average speed of 40 MPH, <br /> <br />TEMS TO BE TRUCKED`~0 SCRAP YARD <br />TRUCKING ASSUMPTI S: Truck $ Helper TOTAL <br />LIGHT TRK. < 25 TONS $70.55 $20.00 $90.55 <br />MED. TRK. 25 TO 50 TONS $74.46 $20.00 $94.46 <br />HEAVY TRK. > 50 TONS $108.01 $20.00 $128.01 <br />FLATBED TRUCK < 10 TONS $54.11 $20.00 $74.11 <br />AVE. SPEED 40 miles per hour <br />ROUND TRIP MILEAGE miles TIME 1.60 <br />ITEM DIMENSI S <br />W X L X H LOAD/UNLOAD <br />TIME (HR) UNIT COST <br />($/hr ) TOTAL COST <br />Line Power Substn. - 1MV 10' X 20' X 8' 0.5 $74.11 $155.63 <br />Conve or Gant 10' X 40' X 8' 0.5 $90.55 $190.16 <br />Culvert # 1 42" D X 100' 0.5 $90.55 $380.31 <br />Culvert # 2 18" D X 80' 0.5 $90.55 $380.31 <br />Culvert # 3 18" D X 60' .5 $90.55 $190.16 <br />Culvert # 4 18" D X 50' 5 $90.55 $190.16 <br />Culvert # 5 18" D X 40' 0. $90.55 $190.16 <br />Culvert # 6 30" D X 40' 0.5 $90.55 $190.16 <br />Culvert @ Drill Pad in Mu Ck. * 30" D X 40' 0.5 $90.55 $190.16 <br />Culvert @ Can onto South * 42" D X 60' 0.5 $90.55 $190.16 <br />Culvert above T'soil Stockpile * 18" D X 40' 0.5 $90.55 $190.16 <br />Mun er Creek Culvert * 72" D X 50" 1.0 $90.55 $235.43 <br />GATE 1 ea 6" X 30' X 4' 1.0 $74.11 $192.69 <br />Power Poles - 18 ea 18" dia X 60' 2.0 $74.11 $266.80 <br />Power Line Conductor 4 ~ 4 800' 10.0 $94.46 $1,095.74 <br />Fan & Portal Arch ** 8' X 10' X 30' 6.0 $74.11 $563.24 <br />WIRE FENCE REMOVAL 1 900 LFT $0.730 1 387.00 <br />TOTAL TRUCKING C0 <br />* Excavation of these items are detailed in Tasks 3 and 4. <br />**Includes removal of skid mounted fan & Portal Arches. <br />***Total Cost includes Loading Time in column 3 above plus trucking <br />Demolition of Power Line <br />The power line will be removed with the D - 4 cat and Two Labon <br />Poles will be cut down with a chain saw, the conductor will be rei <br />stump will be pulled from the ground with the D - 4 <br />The poles will be skidded to a central location for loading. <br />The conductor will be cut into manageable pieces and loaded on <br />Cut down poles and disconnect conductor <br />Skid Poles to loading area <br />Remove conductor 4 wires 300 ft long per trip <br />TOTAL <br />TOTAL STRUCTURAL <br />Mu Vol. I <br />Page 13 <br />$6,178.38 <br />of 1.6 hours <br />ed, and the <br />D-4 @ $/hr 45.00 <br />Laborers @ $/hr $20.00 <br />truck for scrap. <br />me (ea.) Total Time COST <br />0.5 9 360.00 <br />0.5 18 810.00 <br />1 16 720.00 <br />LINE REMOVAL COST 1,890.00 <br />$8,068.38 <br />12/18/96 <br />