Laserfiche WebLink
TABLE 3.9-1 EARTHWORK ESTIMATING -TRUCK TO MINE SITE <br />TASK DESCRIPTION - Haul Topsoil and excess material from drainage <br />to Munger Mine Site. <br />HOURL QUIPMENT COST <br />MACHINE MAKE AND MODEL - 12 yd Truck <br />OWNERSHIP 30.00 COST/hr <br />OPERATING 22.00 COST/hr <br />ADJUSTMENTS none <br />OPERATOR 22.00 COST/hr <br />TOTAL MACHINE COST <br />MATERIAL QUANTITIES <br />Topsoil <br />Munger Ck <br />Culverts <br />TRUCKING COST <br />. Distance <br />Load time <br />Travel time <br />Dump <br />Retum Time <br />Trip Time <br />Hourly Prod <br />Bank Vol.-cuyd Swell <br />1,539 1.1 <br />556 1.1 <br />133 1.1 <br />Total Volume <br />1.50 miles <br />9.92 min <br />4.50 min X20 mph avg, <br />0.50 min <br />4.50 min X15 mph avg. <br />9.42 Min <br />,7.08 cuyd/hr <br />Task 6 <br />$74.00 <br />Loose Vol. yd <br />1, 693 <br />612 <br />146 <br />2,451 <br />Total Timed 66.09 Hours <br />JOB COST <br />TOTAL MATERIAL VOLUME <br />HOURS TO COMPLETE JOB <br />TOTAL MACHINE COST <br />COST PER UNIT VOLUME <br />2,451 CUBIC YARDS <br />66.09 HOURS <br />$74.00 <br />TOTAL JOB COS $4,890.99 <br />$1.996 /L Y <br />n <br />U <br />Mu Vol I Page - 7 I 8/30/96 <br />