My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-24_PERMIT FILE - C1981020A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981020A
>
2008-01-24_PERMIT FILE - C1981020A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:26 PM
Creation date
2/7/2008 10:25:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
1/24/2008
Section_Exhibit Name
3.0 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />In the area along the road just below the mine site, steep slopes are present. The <br />Operator utilized terraces on the reclaimed slope to prevent excessive erosion and to <br />provide long-term stability in cut and fill slopes. To the extent practicable, the terraces <br />and the crest of the remnant cut and fill slopes were rounded or reduced and shaped to <br />conform to adjacent terrain. Minimal material was excavated from the slope <br />immediately below the berm in this narrowest portion of the road. Material to fill these <br />steeper areas was excavated from the switchback just below the steep area. This <br />material was moved into place with the wheel loader and dozer. To ensure that the <br />configuration proposed would create a material balance, the volume of cut and fill was <br />calculated. The tabulated calculation is presented in Table 3.9-2 and shows that there <br />will be a total of nearly 34,000 bank cubic yards of material with a slight deficit of 235 <br />cubic yards of material. The deficit is not significant. <br />Mine Road Stability Analysis <br />To ensure that the reclamation of the mine site and road would be stable, <br />analysis of stability was performed on three areas on the road and two on the mine site. <br />These calculations indicate that the reclaimed slopes will be stable. The locations of <br />these cross sections are shown on Figures 3.1-2 through 3.1-7. These sections <br />generally duplicate the location of stability analysis performed in 1982 in response to <br />questions by the Division about future haul road construction. In conjunction with the <br />previous stability analysis, detailed geologic mapping of the area and triaxial tests were <br />performed to determine the engineering characteristics of the soil types existing along <br />the road. Some areas not analyzed previously where added because the existing <br />configuration does not include the large cuts anticipated for the previous submittal. <br />The mapping and analysis revealed that two soil types exist along the road. First is soil <br />of alluvial origin that is high in gravel and sand content and exists along the lower <br />portions of the road on the points that Geo-Hydro identified as "river terraces." The soil <br />has low cohesion, 200 PSF; a high angle of internal friction, 28°, and a density of 125 <br />TR-23 3-8 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.