Laserfiche WebLink
Appro>amately 30 acres were disturbed by the operation, none of which were redaimed. Trapper Mining <br />Inc. reclaimed the pit and surrounding disturbed areas following completion of Trappers mining activities <br />in this area. Reclamation was in accordance with an agreement with Empire Energy (refer to Sedion <br />3.5.5). The pre-mine land use was rangeland with some dry land fanning. <br />Utah International Inc. began operations at the Trapper Mine in February, 1977, with the start-up of top- <br />soil removal. The first coal was mined in April, 1977. Reclamation of disturbed areas began in 1978. <br />Adivities steadily increased through 1979 when the mine reached full produdion. Refer to Sedions 3.1.4 <br />and 3.1.5 for a more detailed discussion of the current and proposed mining and redamation operations. <br />Only minor regreding and no retopsoiling or seeding was accomplished prior to May 3, 1978. <br />Pre-permit disturbance and reclaimed areas according to the dates spedfied by the regulatory authority <br />are shown on maps MSA-D. <br />3.1.4 Oceretions Plan <br />Trapper Mine is a surface coal mine that supplies coal to the Craig Generating Station owned by Tri-State <br />Generation and Transmission Assodation, Inc., Sall River Projed Agricultural Improvement and Power <br />• Distrid, PacifiCorp, and Platte River Power Authority. When economically feasible, additional tonnage is <br />supplied to other markets. Table 3.1-1 lists Trapper Mine's ma>amum annual produdion rate. Adual <br />produdion in any given year may be less than this by as much as several hundred thousand tons <br />depending on future market conditions. Thus, maps showing topsoil removal and replacement, mining, <br />regrading, etc. may be out of sequence (ahead) of what adually e>asts on the ground at any given point <br />in time. <br />• 3-9 <br />- - -P2-- - _-- - <br />~::; :. ;NIAY. i ~ »~~._ <br />