My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-17_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2008-01-17_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:06 PM
Creation date
2/7/2008 10:18:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
1/17/2008
Section_Exhibit Name
3.0 Project Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas, other than advancing pits, must have topsoil removed due to surface dis- <br />~.`~ Curbances. Topsoil Erom these areas is removed and stockpiled. <br />3.2.2 Storage <br />When it becomes impractical [o promptly redistribute material removed under Sec- <br />tion 3.2.1, such material must be stockpiled. The major reason for stockpiling <br />topsoil at Trapper Mine is [he relation between the timing of the topsoil salvage <br />season and the advancement of pits and active regraded areas. Because of weather <br />constraints, topsoil operations are usually conducted about six months per year, <br />generally May through October. During this time, topsoil is removed from areas <br />that may not be regraded for aeveraL years. Therefore, there is sometimes more <br />topsoil removed than can be replaced since replacement areas have not yet been <br />mined or regraded. <br />When topsoil is removed for a road, dam, storage area or similar disturbance, it <br />• may be stockpiled near the disturbance for replacv~nent once the area has been <br />reclaimed. <br />Topsoii stockpiles are selectively Located on stable areas within the permit area <br />that are protected from wind and water erosion, future disturbance and contami- <br />nants that could lessen the capability of the materials Co support vegetation <br />when redistributed. Sites are usually on relatively level areas, Eree of brush <br />and rock, and away Erom the bottom of drainages. Section 4.9.2 should be con- <br />sulted for clarification on placement of topsoil stockpiles. <br />After the material is stockpiled, the stockpiles are graded to 3h:ly or lesser <br />slopes to prevent erosion, then seeded with gcasses as described in Section 4.9. <br />• <br />3-20 <br />REVISED FEB 13 '87 <br />
The URL can be used to link to this page
Your browser does not support the video tag.