My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-24_REPORT - C1981018
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2008-02-24_REPORT - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:23:15 PM
Creation date
2/6/2008 9:27:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REPORT
Doc Date
2/24/2008
Doc Name
4th Qtr 2007 Review Letter
From
DRMS
To
Blue Mountain Energy
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />February 4, 2008 <br />Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />3607 County Road #65 <br />Rangely, CO 81648 <br />RE: Deserado Mine, Permit C-81-018 <br />Forth Quarter 2007 Coal Processing Waste Banks Report <br />Dear Mr. Wanstedt, <br />The Colorado Division of Reclamation, Mining, and Safety (CDRMS) have found the above <br />referenced report to be in compliance with CDRMS Regulations: 4.09.1(11) and 4.10.2(2). <br />COLORADO <br />DIVISION O F <br />RECLAMATION <br />MINING <br />- &- <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />Please note that a minimum of quarterly inspection is required and for Deserado, more frequent <br />inspection is required during critical construction periods associated with 1) removal of topsoil, 2) <br />installation of surface drainage systems, 3) placement and compaction of materials, and 4) <br />revegetation. Please ensure that these specific activities are inspected and documented by date in the <br />report if they should occur during the quarter. <br />It is noted that two maintenance issues were completed since the Third Quarter Report, <br />A firm base was constructed and material stockpiled later in the quarter and refuse was dumped, <br />spread, and compacted on both 2/3/4 and Sa. <br />If you have any questions feel free to contact me. (303) 866-6424 <br />Sincerely, <br />t <br />Jason M ck <br />Environmental Protection Specialist <br />Cc: Dan Hernandez, CDRMS <br />Office of <br />Office of Active and Inactive Mines <br />Mined Land Reclamation Denver Grand Junction Durango <br />
The URL can be used to link to this page
Your browser does not support the video tag.