My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-02-04_REPORT - C1981018
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981018
>
2008-02-04_REPORT - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:22:05 PM
Creation date
2/6/2008 9:27:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
REPORT
Doc Date
2/4/2008
Doc Name
2007 Annual Hydrology Report
From
Blue Mountain Energy
To
DRMS
Annual Report Year
2007
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
simplicity. The Deserado Mine coal seams are located near the bottom of the Coal and <br />Siltstone Facies (middle zone). Water levels were measured in the groundwater monitoring <br />piezometers according to the schedule in Appendix A. The water level is measured <br />quarterly in Qal-5, and samples collected annually to analyze for the water quality <br />parameters listed in Table 2-1. <br />As a part of the mid-term review technical revision (TR48), DRMS approved discontinuing <br />the monitoring of the following wells: <br />TW2-7U It has remained dry <br />TW2-7L It has remained dry <br />2-7U It has remained dry <br />2-7M It has remained dry <br />2-7L It has remained dry <br />35-4U It has remained dry <br />35-4L It has remained dry <br />RM-1 It has remained dry <br />35-4M This hole is venting methane; presumed dry <br />36-2U This well is in a sealed, inactive mining area <br />36-2L This well is in a sealed, inactive mining area <br />BME also requested that the monitoring frequency be reduced to annual for all bedrock <br />wells and quarterly for alluvial well Qal-5 and the water sampling requirement be annual for <br />Qal-5. DRMS approved BME's application on November 10, 1998. These changes took <br />effect for the 1998-1999 water year. <br />During October 1984, the Taylor Draw Reservoir facilities were completed and the reservoir <br />began filling with water. The area around the alluvial groundwater holes became a shallow <br />water mud flat area with the deposition of mud, silt and sand at high reservoir levels. As a <br />result, alluvial groundwater monitoring holes Qal-1, Qal-2, Qal-3, Qal-4 and Qal-6 have <br />been destroyed and are no longer available for monitoring. Alluvial well Qal-5 is still being <br />monitored. <br />During May 1987, longwall panel 1 was mined past the location of 2-12U. The location was <br />subsided and the monitoring hole could no longer provide usable data. Accordingly, <br />Western Fuels, Utah (now BME) applied for a Technical Revision on 6/7/88 to eliminate <br />groundwater monitoring at 2-12U. The Technical Revision was subsequently approved. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.