Laserfiche WebLink
Y <br />CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Agency or organization name : CDRMS <br />Task # : X05 State :Colorado <br />Date :02/04/2008 County :Delta <br />User : JDM Site :Bowie Exploration' <br />Permifrob # :X--2008-217-12 <br />Abbreviation :none <br />Filename :X-12-X05 <br />Permit or other job action :Jeep Trail Exploration <br />Task description :Mobilize and demobilize equipment from Grand Junction <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 200 <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br /> <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cosUhour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />CosUfleet <br />-Cat D5G LGP - 5P 12.17 $16.86 $88.67 1 $105.53 $88.67 $0.00 <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 1 $187.80 $125.45 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $293.33 $214.12 $0.00 <br />sheet 1 of 2 <br />