Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : X03 State :Colorado PermiUjob# :X--2008-217-12 <br />Date <br />User <br />02/04/2008 <br />JDM <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $18.61 NA <br /> Operating cosUhour : $27.20 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $78.59 Total fleet cost/hour : $78.59 <br />_: <br /> <br />MATERIAL QUANTITIES ::_ <br />_. <br />Initial Swell Loose <br />volume : 1,694 LCY factor : NA volume : 1,694 LCY <br /> <br />Source of estimated volume :App. 1.05 acre X 12 in thick <br />Source of estimated swell factor :NA <br /> <br /> <br />HOURLY PRODUCTION <.: <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 120 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 261.4 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.50 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8,000 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (PA1) <br />Material weight : 2, 550 Ibs/LCY Net correction : 0.49 <br />Weight description <br />Earth - Drv vacked <br />. .: <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />County :Delta Abbreviation :none <br />Site :Bowie Exploration Filename :X-12-X03 <br />Adjusted unit production : 128.83 LCY/hr <br />Adjusted fleet production : 128.83 LCY/hr <br />Total job time : 13.15 Hours <br />Unit cost : $0.610 /LCY Total job cost : $1,033 <br />