Laserfiche WebLink
If a significant invasion of noxious weeds occurs after seeding, the weeds will be mowed before <br />they go to seed. The areas will be mowed periodically for additional control as needed. <br />Mechanical control will be used as a first priority. Chemical methods will only be used if no <br />other alternative produces acceptable results. <br />Water -General Requirement <br />To minimize the effect on the prevailing hydrologic balance, the operator shall: <br />a. Comply with all applicable Colorado water laws. <br />b. Comply with all applicable Federal and State water quality laws and regulations. <br />c. Comply with all Federal and State requirements for dredge and fill. <br />d. Re-grade and backfill all sediment and siltation structures after mining is completed. <br />Groundwater -Specific Requirements <br />The operation will not affect groundwater quality on or off the site. The operation will comply <br />with State groundwater quality standards. Due to the absence of sources of potential pollutants, <br />groundwater quality monitoring is not required in this operation. <br />SerFer Project <br />DRMS 112 Permit <br />Page 9 <br />