My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-24_GENERAL DOCUMENTS - M1984108
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984108
>
2008-01-24_GENERAL DOCUMENTS - M1984108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:25 PM
Creation date
2/1/2008 3:37:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/24/2008
Doc Name
Notice to increase the financial warranty
From
DRMS
To
Western Gravel, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PUMPING WORK <br />PROJECT IDENTIFICATION <br />Task no.: 001 State :Colorado Permit/job no.: M-1984-108 <br />Date : 01/12/2008 County :Montrose Abbreviation :none. <br />User : WHE Site :Olathe Pit Filename :M108-001 <br />Agency or organization nameDRMS <br />Permit or other job action :Routine bond updafe <br />Task description : Dewater North Pond <br />.: <br />HOURLY EQUIPMENT COST <br /> <br />Description Quantity Data <br />Source <br />Pump : Centrifugal pump - 90M, 6 in. 1 (CRG) <br />Suction hose : Suction hose - 6 in. diam., 25 ft. 4 (CRG) <br />Discharge hose : Discharge hose - 6 in. D., 25 ft. 6 (CRG) <br />Labor : Pump operator 1 (CDOT/RSM) <br />Cost Breakdown <br />Ownership cost/hour <br />Operating cost/hour <br />Operator cost/hour <br />Total cost/hour <br />$19.80 NA <br />$38.07 <br />Job shift basis : 3 per day <br />Horsepower: 70 <br />Weight (UST) : 1.05 <br />Total fleet cost/hour : $38.07 <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume : 4,349,802.30 gallons factor : 1.0000 volume : 4,349,802 gallons <br />Total pond inflow surface Unit inflow rate in Total pond inflow volume <br />area : NA sq. ft. gph/sq. ft.: NA per hour : 0.00 gph <br />Source of volume estimate : (21536.5cy)(27cf/cy)(7.4805ga1/cfJ = 4,349,802.3 gallons <br />PUMPING TIME <br />Maximum pump capacity : 70 gph/pump Adjusted pumping capacity : 90,000 gph <br />Estimated suction head : 8 feet Initial unadjusted pumping time 48.33 hours <br />Estimated discharge head : 15 feet Inflow during initial pumping : 0 gallons <br />Total head : 23 feet Net unadjusted pumping time : 48.33 hours <br />CPB pump capacity : 90,000 gph/pump .Altitude adjustment factor : 1.0638 (3% rule) <br />Site altitude : 5,350 feet Pump efficiency factor : 1.0909 (55 min./hr) <br />Inflow as % of pond volume : NA % Total adjusted pumping time : 56.09 hours <br />_... <br />JOB TIME AND COST <br /> Total job time : 56.09 hours <br />Unit cost : $0.000491 per gallon Total job cost : $2,135 <br />Job Utilization <br />$4.71 NA <br />$13.56 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.