My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-24_GENERAL DOCUMENTS - M1984108
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984108
>
2008-01-24_GENERAL DOCUMENTS - M1984108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:25 PM
Creation date
2/1/2008 3:37:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/24/2008
Doc Name
Notice to increase the financial warranty
From
DRMS
To
Western Gravel, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost: $18.34 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $18.34 NA NA $7.24 $13.70 $8.05 $13.21 NA NA NA NA <br />-Attachment no. 2 : NA NA NA $1.21 $1.30 $2.21 $1.31 NA NA NA NA <br />Annual usage : $27.67 $12.45 $17.29 NA NA NA NA NA NA NA NA <br />Double shifts : $20.75 $6.22 $8.64 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.46 $4.14 $5.76 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $5.65 NA $6.28 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.94 NA $1.72 NA NA NA NA NA <br />Fuel/tube -Dozer and ROPS : NA NA NA NA NA NA NA $30.56 $6.01 $0.00 $2.02 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.34 $0.00 $1.09 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuet <br /> <br />Lube Tires <br /> <br />G.E.C. <br />Dozer, ROPS and Attachment no. 2 : Dozer and ROPS <br />Single shifts : $27.67 $12.45 $17.29 $5.65 $13.70 $6.28 $13.21 $30.56 $6.01 $0.00 $2.02 <br />Double shifts : $20.75 $6.22 $8.64 ttachment no. 2 <br />Triple shifts : $18.46 $4.14 $5.76 $0.94 $1.30 $1.72 $1.31 $0.00 $0.34 $0.00 $1.09 <br /> <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 9.80% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp) $20.67 $7.22 $1.58 $1.28 $2.03 $32.78 Swing : $0.30 Three shift per day average : $0.25 <br />Mechani $20.97 $7.22 $1.60 $1.30 $2.06 $33.15 Night : $0.45 <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operatin <br />Machine g and Overhaul <br />Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $57.40 $77.43 $6.71 $32.78 $174.31 <br />Double shifts : $35.62 $77:43 $6.71 $32.93 $152.68 <br />Triple shifts : $28.36 $77.43 $6.71 $33.03 $145.52 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />Dozer : Cat D8R Series 11 - 8U (20 310 NA 41.8 22.8 8.7 11.5 diesel NA <br />Blade : Universal NA NA 6.0 NA 14.0 5.7 NA NA <br />Attachment no. 1 : ROPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : 3-shank ripper NA NA 5.4 3.6 7.1 2.6 NA Adj. Parallelogram <br />Total weight : 53.2 (UST) <br />
The URL can be used to link to this page
Your browser does not support the video tag.