My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-24_GENERAL DOCUMENTS - M1984108
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1984108
>
2008-01-24_GENERAL DOCUMENTS - M1984108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:25 PM
Creation date
2/1/2008 3:37:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984108
IBM Index Class Name
GENERAL DOCUMENTS
Doc Date
1/24/2008
Doc Name
Notice to increase the financial warranty
From
DRMS
To
Western Gravel, Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />:> <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DRMS <br />Task # : 013 State :Colorado Permit/job # : M-9984-108 <br />Date :01/22/2008 County :Montrose Abbreviation :none <br />User : WHE Site :Olathe Pit Filename : M108-013 <br />Permit or other job action :Routine Bond Review <br />Task description :Haul reclamation <br />to and from iob site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25r 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br /> <br />-Cat D8R Series /I - 8U (200 53.17 $50.59 $125.45 2 $352.08 $250.90 $0.00 <br /> <br />-Cat 633E Series 2 (2001) 56.34 $80.67 $125.45 2 $412.23 $250.90 $0.00 <br /> <br />-Centrifugal pump - 90M, 6 i 1.11 $16.05 $88.67 2 $209.44 $177.34 $0.00 <br /> <br />-CAT 825G Series 11(2005) 36.08 $56.16 $117.55 2 $347.42 $235.10 $0.00 <br /> <br />-Revegetation equip 20.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> <br />-Reveg failure 10.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br />:, <br /> <br /> <br />Subtotals : $1,528.51 $1,091.58 $0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.