Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : DRMS <br />011 State :Colorado <br />01/22/2008 County :Montrose <br />WHE Site :Olathe Pit <br />Permit or other job action :Routine Bond Update <br />Task description :Replace topsoil one foot deep over 3.67 acres of the South Pond area <br />HOURLY EQUIPMENT COST <br />Cost Bre <br />Scraper work team -Scraper :Cat 633E Series 2 (2001) <br />-Push dozer:NA <br />Support equipment -Load area :Cat D8R Series 11 - 8U (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />Utilization-machine : 100 NA 25 NA NA NA <br />-Ripper attachment : NA NA 5 NA NA NA <br />Ownerhip cost/hour : $80.67 NA $50.59 NA NA NA <br />Operating cost hour : $117.98 NA $19.36 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $223.59 NA $102.73 NA NA 'NA <br />Number of units : 1 0 1 0 0 0 <br />Group subtotals : Work : $223.59 Support : $102.73 Maintenance : $0.00 <br />Total work team cost/hour : $326.32 <br />_. _ _ _ ___ <br />_. _ _ _ ___ <br />_. <br />___ <br />__ _ __. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,921 LCY factor : NA volume : 5,921 LCY <br />Source of quantity take-off : (3.67ac)(43560sf/ac)(1'D) /27 = 5920.9 cy <br />Source of estimated swell factor : NA <br />uipment Description <br />Permit/job # :M-1984-108 <br />Abbreviation :none <br />Filename :M108-011 <br />Shift basis : 1 perday <br />