My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-31_REPORT - C1981035
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981035
>
2008-01-31_REPORT - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:21:49 PM
Creation date
2/1/2008 10:15:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
REPORT
Doc Date
1/31/2008
Doc Name
2007 Annual Reclamation Report
From
GCC Energy
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,. <br /> <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 200 <br />Kinq II <br />mine name <br />Address: 4424 C.R. 120 <br />CO 81326 <br />National King Coa1,LLC <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be dearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 0. 0 0 + 2 0. 0 0 = 2 0. 0 0 <br />Acres backfilled and raded 0 .0 0 + 1.0 0 1. 0 0 <br />Acres to soiled 0. 0 0 + 1 .0 0 1. 0 0 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />Parh ratennrv helnw Ian not include armies that have achieved final- Phase III release- <br /> last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br />Acres seeded" 0.0 0 + 1. 0 0 = 1.0 0 = 1.0 0 + 0 . 0 0 <br />"include, rt necessary, a description of any augmenteo seeoing or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 2 0.0 0 and the total number of acres: <br />Phase I released 0.0 0 Phase I I released 0.0 0 Phase I11 released 0 .0 0 <br />For Mines in Permanent Cessation: <br />Total acreage in fadlities subject to reclamation but yet to be completed N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z 2 0 .0 0 <br />Acreage in active mining areas s. <br />'(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stodq~iles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stodgriles, loading, and processing areas; railroads; coal conveyors; nonbadfilled and <br />graded areas of refuse piles, coal mine waste impoundmenrts, head-0f-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by~roduds disposal areas). <br />s Includes pits, topsoil stripped areas in advance of pits, and spoil not badkfilled and graded <br />C-1981-035 <br />permit # <br />20.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.