Laserfiche WebLink
ATTACHMENT 13-10 <br />TABLE OF CONTENTS <br />Page <br />Introduction 13-10-1 <br />Time Frame of Move 13-10-1 <br />Construction Activities 13-10-1 <br />Dragline Movement 13-10-3 <br />Sediment Control 13-10-5 <br />Reclamation 13-10-6 <br />Actual Dragline Move 13-10-6 <br />Revised (1997) Reclamation Schedule and Plans 13-10-6 <br />Postmine Channel (Maneotis Property) Reconstruction Design 13-10-7 <br />LIST OF TABLES <br />Table No. Page <br />Table 1 - Cut/Fill Volumes Under Powerline 13-10-4 <br />LIST OF FIGURES <br />Figure No. <br />Figure 1 - Temporary Topsoil Stockpile Location <br />Figure 2 - Turnout Existing Topography <br />Figure 3 - Turnout Regrading Plan <br />Figure 4 - Turnout Regrading Cross Sections <br />Figure 5 - Dragline Deadhead Route Channel Reconstruction <br />LIST OF ADDNEDUM <br />Addendum No. <br />13-10A - Temporary Diversion Design, SEDCAD+ (Input and Output) <br />13-lOB - Dragline Deadhead Route Postmine Channel SEDCAD Demonstration <br />13-lOC - Channel from Hallenbeck Stockpond to Culvert YA-l, SEDCAD+ <br />(Input and Output) <br />• <br />TR-36 TOC-i Revised 08/07 <br />