Laserfiche WebLink
High une ~linal Co <br />PrQ~ Bac 800 <br />ITiDdly Fad CO B'iltJ(i7 <br />January 28, 20013 <br />Deb Zack <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Dear Ms. Zadk: <br />Dan Henrtchs SupC~intonCent <br />40707 E Hwy 50 <br />Avondale, CO 81022 <br />(719~68~4107 <br />As authorized representative of the High Line Canal Company (High Line) in the matter of Pheasant <br />Run Gravel Pit, File No. M-2007.069, application of Centennial State Paving, Inc. (Centennial), I hereby <br />provide this letter withdrawing High Line's objection t0 the permit application. The withdrawal of this <br />abjection is based on a recent agreement between High Line and Centennial which conditionally <br />approves Centennial's right of entry and mining in the vicinity of the High Line Canal. <br />Without limiting the scope of the agreement it generally provides the following: 1 }mine operations shall <br />not damage the Canal or interfere with the operation of the Canal, 2) mining north of the Canal shall <br />remain at least 200 feet from the north bank of the Canal, 3) Centennial may mine Goser on the north <br />only after High Line and Centennial negotiate a safe setback distance based on a geotechnical slope <br />stability analysis to be provided by Centennial, 4) mining will start south of the Canal, 5} the area <br />between Phase 2 and Phase 3 on the north side of the Canal shalt not be mined. 5) a temporary bridge <br />may be placed over the Canal with at least 4 feet of freeboard, 6) mining south of the Canal will begin <br />na closer than 50 feet from the Canal bank and shall not be excavated at a steeper than a 3:1 slope, 7) <br />if groundwater is encountered, Centennial will cover the exposed water area to at Least 2 feet above the <br />water, 8) no dewatering will be discharged into the Canal, 9) Centennial may be required to monitor <br />seepage from the Canal, 10) High Line shall have access to maintain and operate the Canal, 11 } <br />Centennial will compensate High Line for damage, and 12) Centennial wi11 reimburse High Line for its <br />expenses in reviewing this permit application and the future stability analysis, <br />!f you have any questions in this regard please da not hesitate to call me. <br />Sincerely, <br />G~L~~ !~6' / - <br />Mark A. McLean, P.E, <br />Deere 8~ Ault Consultants, Inc. <br />onn /inn 13h C I N1d I l(1CN09 ll(1'd 3x330 69b l L99EOE ?(V3 69 ~ El 8002/8Z/ LO <br />