Laserfiche WebLink
• <br />POND DISCHARGE <br />The following table presents monitoring results for the mine seepage discharge. <br />Water was diverted to the new treatment pond during the week of June 14 to June 21, <br />1999. On August 2, 1999 the new treatment pond was full and disch~~rging. <br />Bear began performing lab analysis on the flow from the spring (hillside) as well as <br />the pond outflow beginning in September 2007. Following are the da1:a. <br />Se tember 2007 <br /> Pond Hillside <br />Total Dissolved Solids m /I 3355 2393 <br />Total Sus ended Solids m /I 35 0 <br />Iron m /I 1.16 3.04 <br />October 2007 <br /> Pond Hillside <br />Total Dissolved Solids m /I 2973 2833 <br />Total Sus ended Solids m /I 0 2.22 <br />Iron m /I 1.09 2.28 <br />• <br />November 2007 <br /> Pond Hillside <br />Total Dissolved Solids m /I 3280 3075 <br />Total Sus ended Solids m /I 28 34 <br />Iron m /I 0.94 1.06 <br />December 2007 <br /> Pond Hillside <br />Total Dissolved Solids m /I 3135 <br />Total Sus ended Solids m /I 32.5 16 <br />Iron m /I 1.22 3 <br />• <br />There does not appear to be any trend in the data presented above. However, <br />the water from the hillside is suitable to discharge directly to the river ~~vithout treatment. <br />The hillside water also passed the fourth quarter 2007 WET test. <br />-5- <br />