Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year __?007________ <br />McClane Canyon Mine <br />mine name <br />C-1980-004 <br />permit # <br />McClane Canyon Mining, LLC <br />------------------------ <br />Permittee <br />Address: 3148 H <br />139, P.O. Box 98, Loma, CO 81524 <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed 12.8 + 0.0 = 12.8 <br />Acres backfilled and raded 3.3 + 0.0 = 3.3 <br />Acres to soiled 3.3 + 0.0 3.3 <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />..i,.....a,.,.,.... ~.,.i...., n,...,.+ i.,,.~,,.i., ~ o +h a+ h~~io arhicvorl final Phaca III ralaaca <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total ~ less ears ~ <br />Acres seeded" 3.3 + 0.0 = 3.3 = 3.3 + 0.0 <br />"include, It necessary, a aescnpuon or any augmentea seeauiy or cunuiai Nia~iwCa <br />For the Entire Life of Mine, the total number of acres disturbed __12'8 _____ and the total number of acres: <br />Phase I released _ -~_ _____ Phase II released __ ~_______ Phase III released __ ~_______ <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed _N/A <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2_____ 9_5 <br />Acreage in active mining areas 3__ 0.0________ <br />(exclude acres where Phase III release has been achieved) <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />s Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />