Laserfiche WebLink
„` <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year aod? <br />Elk Creek ~~hY <br />mine name <br />Address: 3 7 3 7 <br />C -19?3/- c~Z2 <br />permit # <br />~-~J Wq~/ 133 somrrs o~ <br />O~ok1 ~ylih~v~y , < LC <br />Permittee <br />, ~' ~a d' /y3 `~ <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Cate o Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed / y ~ • 88 + 7. 2.0 /SS. Ob' <br />Acres backfilled and raded SS, 03 + / . SZ S6 . SS <br />Acres to soiled SS . 03 + / • S2 ~'6 . S S <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />c~nh r~4cnnn• hclnui rln nn4 inch uie 7rroe fFiaf i'1AV0 flChIP\/P(f final hhaSA III rAIPaRP. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br />Acres seeded* SS, v 3 + / • sz 5 6 , `~ S S0.9S + S, (o <br />'include, if necessary, a descrlptlon of any augmentea seeaing or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed /SS, Ors' and the total number of acres: <br />Phase I released ~ Phase II released ~ <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z /SS, d~ <br />Acreage in active mining areas a N 19 <br />' (exclude acres where Phase III release has been achieved) <br />1V /~ <br />z Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />Phase III released ~ <br />a Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />