Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annuat Reclamation Report for the Year 2006 <br />Golden Eagle C-81-013 Basin Resources, <br />mine name permit # Permittee <br />2 Ncrth Cascade Avenue, 2nd Floor, Colorado Springs, CO <br />Address: <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> Last Years This Calendar <br />Land Status Ca o Cumulative Total Year Cumulative Total' <br />Acres disturbed 5 9.4 5 + 0 _ 5 8. 3 0 <br /> <br />Acres backfilled and railed 5 9.4 5 + 0 = 5 8. 3 0 <br /> 5 9.4 5 + 0 = 5 8. 3 0 <br />Acres to soiled <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />__ ~_~__._ n_ .-.a :....~...a...a....... ~h.~4 hmin ~nhinvnti final Phaca III rAIPASP__ <br />CQWi a.Ql Va Vc~ Vr~. vv ..va ., <br />Last Years vv ..._ <br />This -- - - <br />Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less ears' <br /> 5 9.4 5 0 5 9 .4 5 = 5 9.4 5 + 0 <br />Acres seeded* + = <br />' InCIUde, It necessary, a aescnpzlon OT any augments s~uuky vk a.uaau~a~ N~caa.ua.c~ <br />66.17 <br />For the Entire life of Mine. the total number of acres disturbed and the total. number of acres: <br />Phase I released 6 0.4 7 phase II released 5 9. 2 7 Phase III released 7. 8 7 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 0 <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation faalities Z, <br />Acreage in active mining areas s <br />' (exclude acres where Phase Ili release has been achieved) 1.15 Acres Phase III released i n 2 0 0 6 <br />2 includes haul and access roads; temporary dams and impoundmenrts; permanent dams and impoundments; diversion and <br />collector ditk~, water and air monitoring sites; topsoil stockpiles: overburden stockpiles; repair, storage and construction areas; <br />office area, repa'u shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundmenrts, head-of-hollow fills, and vaNey fills; ventilation shafts and entryways; <br />and nonCOal waste disposal area {garbage dumps and coal combustion by-produds disposal areas). <br />Inc. <br />80903 <br />0 <br />0 <br />' Includes pits, topsoil stripped anus in advance of pits, and spoil not I~acld'iGed and graded <br />