My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981033 (27)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981033
>
_INSPECTION - C1981033 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2020 11:48:44 AM
Creation date
1/24/2008 10:51:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
1/16/2008
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS-COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made during the <br /> inspection. Comments also describe any enforcement actions taken during the inspection and the facts or <br /> evidence supporting the enforcement action. <br /> This was a partial inspection conducted by Joe Dudash of the Colorado DRMS.No one represented the operator <br /> during the field inspection. The entire area received considerable snowfall the week before and there was one to <br /> two feet of snow at the mine site. <br /> Roads <br /> The entrance to the mine site was blocked by a snow berm that was made from the grading of the main highway. <br /> The paved haul road into the site was snow covered,as was the bridge. <br /> Signs and Markers <br /> The mine ID sign was on the ground and buried under snow at the top of the hill. The sign needs to be put back <br /> up. The"no trespassing" sign was on the front gate. <br /> Facilities <br /> The front gate at the bottom of the hill was closed but not latched or locked. The mine office debris has been <br /> burned in place. However,there is still some of the office material that needs to be disposed of properly. <br /> Hydrology <br /> The sediment pond was covered in snow but the snow level was at least two feet below the level of the primary <br /> discharge pipe.The hillside spring water treatment pond was also covered in snow. The treatment pond was <br /> discharging. The hillside spring was flowing into its constructed channel that, eventually, flows-into the <br /> treatment pond. <br /> The riverside protection berm was snow covered but appeared to be functional. <br /> c:/word/bear3/insp0108 <br />
The URL can be used to link to this page
Your browser does not support the video tag.