Laserfiche WebLink
Barr Engineering Company <br />4700 West 77th Street LOG OF BORING SB-06-02 <br />BARB Minneapolis, MN 55435-4803 <br />~ Sheet 4 of 4 <br />Project: Monument Dam Location: Paonia, CO client: Mountain Coal Company <br /> Barr Project Number: 06/26-067 ~ STANDARD PENETRATION NATURAL DRY <br /> m TEST DATA DENSITY <br />w ~ o ~ ~ \ N in blows/ft 0° (pcf) it <br /> `' MATERIAL DESCRIPTION ~ a >o to 20 so ao 1os tts ~zs <br /> ~ ~ Z ~ <br /> a (ASTM D2488) a <br />` E' <br />> ~ <br />~ ` ~ ~ <br />~ SHEAR STRENGTH, ksf Water Content, °h <br />lL ~ C7 ~ N QP X UC ~ TV 31f WP WN Wi <br /> ~ VS D VSR O <br /> 1 2 3 4 20 40 60 <br /> 9l) GRAVELLY SAND (SP), with silt, with clay, fine- to v.:.: ;: <br /> coarse-grained, red/tan, saturated, medium dense; clasts <br />° 100 ~> 100 <br /> very angular, looks similar to exposed talus/colluvium on <br /> right (north) abutment <br />o ... <br /> 7246.9 <br />` ~~ . ~: <br /> VW piezometer installed at depth of 93.0 feet using the <br />93 <br />3 <br /> . <br />full -routed method PZ-06-03 serial # 86376 <br /> End of boring at 93.3 feet, refusal <br /> 95 <br /> 100 <br /> 105 <br /> 110 <br /> 115 <br /> 120 <br />Completion Depth: 93.3 Remarks: <br />Date Boring Started: 7/6/06 <br />Date Borin <br />Com <br />leted: 7/7/06 <br />p <br />g <br />Logged By: JDG SAMPLE TYPES WATER LEVELS <br />Drilling Contractor: DA Smith <br />Drilli <br />S <br />~ Auger Cutting ,Shelby Tube ~ While Drilling: 22.5 <br />- <br />ng Method: H <br />A End of Drilling: <br /> ® Split Spoon ~ Rock Care <br /> hrs After Drilling: <br />fhe stratification lines represent approximate boundaries. The transition may be gradual. <br />