Laserfiche WebLink
- <br />LOG OF TEST PIT Trench 9 <br />BARR <br />~ Sheet 1 of 1 <br />Project: Monument Dam Location: Paonia, CO client: Mountain Coal Company <br /> Barr Project Number: 06/26-067 ~ STANDARD PENETRATION NATURAL DRY <br /> d TEST DATA DENSITY <br />w ~ c ~ 3 o N in blows/ft OO (pcf) ~t <br />o L MATERIAL DESCRIPTION ~ Q > o to zo so ao fos tfs tzs <br /> ~ Z ~ <br /> (ASTM D2488) a <br />~ o ~ m a a SHEAR STRENGTH, ksf Water Content, <br />W ~ E VJ <br />C <br />TV WP WN Wl <br /> N ~ <br />Qp X U <br />3IE <br /> Surtace Elev.: 7261.0 r 1 2 3 4 10 20 3o <br /> 0 Topsoil (OL), contains red gravel ' ' • ` <br /> t;.:;~ ;; <br />7260 <br /> 7259.5 '~''' ~` <br /> Silt (ML), brown/gray, moist; with clay lenses 1.5 <br /> 7256.8 <br /> Alternating fine grained sand (SP) and clay (CL), brown and 4.2 .:: ~:':: <br /> 5 orange, moist; with boulders (>3~ at about 10' <br /> <br />7255 <br /> 10 <br /> <br />7250 <br /> 15 <br /> <br />7245 <br /> 7244.5 :.'~~~•~•:~ <br /> Bottom of trench 16.5 <br /> 20 <br />Completion Depth: 16.5 Remarks: West of toe of dam, further downstream than Trench #5 <br />Date Boring Started: 10/23/06 <br />Date Boring Completed: 10/23/06 <br />Logged By: BWL SAMPLE TYPES WATER LEVELS <br />Drilling Contractor: Chesnik <br />er Cutti <br />,Sh <br />lb <br />T <br />b <br />m Au While Drilling: <br />Drilling Method: Test Pit g <br />ng <br />e <br />y <br />u <br />e <br /> <br />® Split Spoon a Rock Core End of Drilling: <br /> hrs After Drilling: <br />The stratification lines represent approximate boundaries. The transition may be gradual. <br />