Laserfiche WebLink
- <br />LOG OF TEST PIT Trench 2 <br />BARR <br />~ Sheet 1 of 1 <br />Project: Monument Dam Location: Paonia, CO client: Mountain Coal Company <br /> Barr Project Number: 06/26-067 ~ STANDARD PENETRATION NATURAL DRY <br /> a~ TEST DATA DENSITY <br />w ~ o ~ ? e N in blows/ft O (pcf) ~ <br />o L MATERIAL DESCRIPTION ~ a > o io zo so ao cos ~~s tzs <br /> ~ Z ~ <br />> ~ (ASTM D2488) a <br />m ~ <br /> <br />~ ~ ~ <br />~ SHEAR STRENGTH, ksf Water Content, <br />u1 ~ ~ ~ <br />C <br />TV 31E WP WN WL <br /> 0 Surface Elev.: 7292.3 rm • <br />OP X U <br />1 2 3 4 10 20 30 <br /> Medium plasticity clay (CL-CH), grayish brown, dry to moist; <br /> reservoir bottom sediment 7291.8 <br /> Matrix: lean clay (CL), trace to with fine to coarse sand, trace 0.5 <br /> fine to coarse gravel, gray/brownloxidation, wet; Total: 30% <br /> boulder (>12"), 20% cobble (3"<d<12"), 50°~ matrix <br />7290 <br /> 7288.3 <br /> Bottom of trench 4.0 <br /> 5 <br />7285 <br /> 10 <br />Completion Depth: 4.0 Remarks: In reservoir bottom on knob near intake structure <br />Date Boring Started: 9/14/06 <br />D <br />B <br />i <br />C <br />l <br />t <br />d <br />9/14/06 <br />t <br />a <br />or <br />ng <br />omp <br />e <br />: <br />e <br />e <br />Logged By: JDG SAMPLE TYPES WATER LEVELS <br />Drilling Contractor: Chesnik ~ Auger Cutting ,Shelby Tube While Drilling: <br />Drilling Method: Test Pit <br />End of Drilling: <br /> ® Split Spoon ~ Rock Core <br /> hrs After Drilling: <br />fhe stratification lines represent approximate boundaries. The transition may be gradual. <br />