My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:29:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Section_Exhibit Name
Exhibit 76 Report Spring 2007 Part 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br />LOG OF TEST PIT Trench 1 <br />BARR <br />~ Sheet 1 of 1 <br />Project: Monument Dam Location: Paonia, CO Client: Mountain Coal Company <br /> Barr Project Number: 06/26-067 ~ STANDARD PENETRATION NATURAL DRY <br /> m TEST DATA DENSITY <br />vy ~ o ~ ~ o N in blows/ft OO (pcf) is <br />o r MATERIAL DESCRIPTION ~ n >o ~o zo so ao tos t~s izs <br /> ~ Z ~ <br />~ (ASTM D2488) a ~ <br /> d <br />~ ~ ?~ ~ <br />~ SHEAR STRENGTH, ksf Water Content, <br />W ~ ~ fA Wv WN W~ <br /> ~ t1P X UC ~ TV CIE <br /> <br />0 Surface Elev.: ~ z s a to zo 30 <br /> Topsoil (OL). `!~~~ <br /> <br /> ~. ~~~• :~ <br /> Gravelly clay (CL), with boulders, brown/tan, moist; boulders 1.3 <br /> up to 3' diameter below 10' <br /> 5 <br /> <br /> <br /> 10 <br /> Bottom of trench (apparent bedrock) 14.0 <br /> 15 <br />Completion Depth: 14.0 Remarks: South of road about 100' <br />Date Boring Started: 10/23/06 <br />Date Borin <br />leted: 10/23/06 <br />Com <br />g <br />p <br />Logged By: BWL SAMPLE TYPES WATER LEVELS <br />Drilling Contractor. Chesnik <br />ill <br />m Auger Cutting 'Shelby Tube 1/Vhile Drilling: <br />Dr <br />ing Method: Test Pit End of Drilling: <br /> ® Split Spoon ~ Rock Core <br /> hrs After Drilling: <br />The stratification lines represent approximate boundaries. The transition may be gradual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.