My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-10_PERMIT FILE - C1980007 (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2007-08-10_PERMIT FILE - C1980007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
1/23/2008 11:28:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
8/10/2007
Doc Name
Design Report for Alteration of Monument Dam
Section_Exhibit Name
Exhibit 76 Report April 2007
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Introduction <br />Monument Dam is located approximately 6.5 miles east of Paonia, Colorado. The dam impounds the <br />Dry Fork of Minnesota Creek, which is a tributary of the North Fork of the Gunnison River. The <br />dam is .owned and operated by Minnesota Canal and Reservoir Company (MCRC) of Paonia, <br />Colorado. <br />Mountain Coal Company (MCC) is planning to expand its mining activities at the West Elk Mine in <br />Somerset, Colorado. The mining expansion includes mining the E Seam using longwall mining <br />techniques. The proposed E Seam mine is overlain by gently rolling mountainous terrain and is <br />located close to Monument Dam. As part of the MCC submittal for Permit Revision No. 10 to the <br />Colorado Division of Minerals and Geology (DMG), MCC was requested to evaluate the <br />geotechnical response of Monument Dam and adjacent landslide to mine-induced seismicity. <br />MCC retained a consultant (GEI, 2006) to evaluate, on a preliminary basis, the probable response of <br />Monument Dam to mine-induced seismicity. GEI (2006) determined that some preventive measures <br />were required for the dam so that it has adequate factors of safety under static conditions and that E <br />Seam mine-induced seismicity will not cause material damage to the dam and landslide. <br />Barr Engineering Co. (Barr) reviewed the work by GEI (2006) and provided a conceptual option for <br />corrective measures. This document contains the design report of the proposed modifications to <br />Monument Dam so that it has adequate factors of safety under static and seismic conditions. <br />A document entitled, "Report of Geotechnical Investigation Conducted at Monument Dam," prepared <br />by Barr and associated with this design report, is included in Appendix C. <br />P:\Mpls\06 CO\26\0626067\WorkFiles\DesignReport\FINAL\DesignReportFINAL.doc 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.