<br />DRILL HOLE TABLE, MR 93, S TAYLOR IN PIT DRILLING, COLOVVYO MINE
<br />! Drill Hole Loca tion Pro sed De th (ft)
<br />' '/<. t/4, Sec. T., R. single hole to bottom of G8 seam
<br />ST-08-O1 j NW, SW, 17 3 N., 93 W. 22S
<br />ST-08-02 SW, SE, 17 3 N., 93 W. 22S
<br />ST-08-03 ; NW, SW, 17 3 N., 93 W. 400
<br />ST-08-04 SW, SE, 17 3 N., 93 W. 300
<br />ST-08-OS SW, SE, 17 3 N., 93 W. 200
<br />ST-08-06 1 SE, SE, 17 3 N., 93 W. 450
<br />ST-08-07 ~ NW, NE, 20 3 N., 93 W. 300
<br />ST-08-08 NW, NE, 20 j 3 N., 93 W. 2S0
<br />ST-08-09 NE, NE, 20 3 N., 93 W. 42S
<br />ST-08-10 SE, SE, 17 ~ 3 N., 93 W. 47S
<br />! ST-08-11 NE, NW, 20 3 N., 93 W. S2S
<br />ST-08-12 NW, NW, 20 ' 3 N., 93 W. i 4S0
<br />! ST-08-13 NW, NE, 20 ~ 3 N., 93 W. , 32S
<br />ST-08-14 NW, NE, 20 E 3 N., 93 W. ; 42S
<br />ST-08-15 SE, NW, 20 j 3 N., 93 W. 42S
<br />_
<br />ST-08-16 SW NW, 20 3 N., 93 W. ' SSO
<br />ST-08-17 SW, NW, 20 i 3 N., 93 W. ! SSO
<br />ST-08-18 SE, NW, 20 ; 3 N., 93 W. ! 400
<br />ST-08-19 j SW, NE, 20 ! 3 N., 93 W. 47S
<br />ST-08-20 ' SE, NW, 20 1 3 N., 93 W. j 400
<br />ST-08-21 ! SW, NE, 20 3 N., 93 W. ~ 47S
<br />ST-08-22 ; SE, NW, 20 1 3 N., 93 W. ; 42S j
<br />ST-08-23 NE, SE, 17 ~ 3 N., 93 W. 1, 400
<br />ST-08-24 , SW, NE, 17 3 N., 93 W. ! 4S0 i
<br /> TOTAL 9,S2S ft.
<br />All drill sites will be well within the permitted pit footprint (refer to enclosed Volume 13
<br />Exhibit 22), on areas already topsoil stripped {the majority) or soon to be stripped in
<br />preparation for the imminent upcoming mining activities.
<br />All drill holes will start at the surface and penetrate no deeper than the bottom of the planned
<br />pit floor or, stated another way, no deeper than the floor of the G8 coal seam. Typically, 2
<br />separate drill holes will be drilled on each drill site, the first being a pilot hole and the second
<br />being the core hole. All drill holes will be surveyed for x, y, z coordinates after being drilled.
<br />All drill holes will not be backfilled with bentonite plug gel/chips and will be left open to
<br />depth since they will soon be mined through during the course of normal pit mining activities.
<br />if for some unforeseen reason the pit does not mine through any given drill hole, that drill hole
<br />will be relocated and sealed in accordance with the rules. A rock will be placed on the top of
<br />all open drill holes to prevent tripping/fallinghazacd for persons or animals.
<br />No additional bonding will be required for surficial or subsurface work. Colowyo proposes to
<br />report on the status of mining through drill holes by incorporating that information into the
<br />Annual Reclamation Report.