Laserfiche WebLink
• Topsoil Removal Plan <br />Prior to any mining related disturbances, topsoil will be removed from the site to be' <br />disturbed as discussed in Section 4.06 and redistributed or stockpiled as necessary to satisfy <br />the needs of the reclamation timetable. <br />Topsoil will be removed in the permit area by large crawler mounted bulldozers, loaders or <br />scrapers as described in Section 2.05.3, Production Methods and Equipment. <br />The sequence and timetable for all topsoil redistribution and revegetation activities is found <br />on the Topsoil Handling Map (Map 28 and 28A). This drawing also shows the location of <br />the topsoil stripping activities for the current term and future terms. <br />A life-of--mine topsoil balance is estimated in Table 2.05-1, Topsoil Balance As Of <br />December, 2005. <br />• <br />• <br />2.05-24 Revision Date: 3/21/06 <br />Revision No: TR-62 <br />