Laserfiche WebLink
ORIGINAL -PUBLIC FILE <br />(Page 2) <br />MINE ID # OR PROSPECTING ID #: -~d-l9R~-add <br />INSPECTION DATE: 1 /9/L17 INSPECTOR^S INITIALS: ~~ <br />OBSERVATIONS <br />The Division conducted a monthly monitoring and quarterly water sampling inspection of the <br />site on 1/9/07. Present during the inspection was Mr. Mark Vanoni of CC&V. <br />The area had received approximately 7 inches snow the day before, which was still on the <br />ground. <br />Inspected the Phase I,II,III&IV Valley leach facility and collected the following readings <br />from the High and Low Volume Solution collection system transducers. <br />Phase I, High Volume Solution Collection transducers,#1 read out meter still not <br />functioning, #2 was at 52.7 and #3 was at 55.0 Piezometer for the pond was at 58.8 feet. <br />Low volume solution collection transducer # 1 was recorded at.38 and # 2 was at.40. <br />Phase II & III High Volume solution collection transducer # 4 was recorded at 45.0 # 5 was <br />at 38.4 and #6 was at 42.9. Piezometer for the pond was at 44.7 feet. Low volume solution <br />collection transducer # 1 was recorded at .04 and # 2 was at .34. <br />Phase IV High Volume Solution collection transducer #7 was recorded at 46.6 # 8 was at <br />47.9 # 9 was at 49.5 and # 10 was at 48.1. Low volume transducer # 1 was recorded at 10.8 <br />& # 2 was at 10.4 inches of Hydro static head. <br />Inspected the External pond, it was holding some water. Low volume solution collection <br />transducer #1 for the pond was recorded at 10.9 and # 2 was at 9.6 inches of hydro static <br />head. <br />Note: All transducer readings are in feet of hydrostatic head unless noted otherwise. <br />Inspected the under drain area, both the south and 1 inch pipes were discharging. Samples <br />for WAD cyanide analysis were collected. Operator also collected samples using their own <br />bottles. All lower ponds were covered with snow from the day before. <br />Walked to the AG1.5 NPDES discharge point, it was covered with snow but no flow was noted <br />at the time of the inspection. <br />Inspected the Cresson mine area. South and East Cresson mine were active at the time of <br />the inspection. East Cresson backfill is continuing <br />Samples collected were placed in ice and delivered to the Colorado Department of Health <br />and Environment Lab. <br />18, E Contact Address <br />NAME: TIM COMER <br />OPERATOR: CCB,V <br />STREET: P_C)_RC~X 191 <br />CITY/STATE/ZIP: VICTnR,Cnl nRAI~(7 R~Rd~ <br />cc: r CE <br />r BL <br />r FS, <br />r HW <br />r HMWMD (CH) <br />r <br />r SE <br />r WQCD (CH) <br />r OTHER <br />