Laserfiche WebLink
Section - 2.05.3 <br />Sedimentation Ponds -Given that surface disturbance is limited by the underground mining <br />operations, OMI utilizes alternative sediment control measures where reasonably feasible to both <br />• intercept and control drainage and sediment as close to it's source as possil;le and to minimize further <br />surface disrurbance. For larger disturbance azeas, however, this approach is not effective in <br />• <br />~r <br />IIWCRF 2.05-33a Revised June 2003 <br />