Laserfiche WebLink
Section - 2.05.3 <br />Detailed design plans for the East I'ard and Upper Hubbard Creek sedimentation ponds and <br />• assotiated ditches were prepared under the direction of Glenn H. Sides (No. 13803) Chief Engineer, <br />United States Steel Cozporanon, Westezn District-Coal. Designs for the East Yard Sedimentation <br />Pond were modified by Thomas C. Anderson, P.E. No. ]4726. <br />Detailed design plans for the Sanborn Creek mine water settling pond and run-off collection and <br />diversion ditches; Elk Creek coal handling, support, and ancillary facilities azea runoff collection and <br />diversion ditches, Sedimentation Ponds A and B and associated ditches and culverts; and the <br />Substation No. 3 Sedimentation Pond and associated ditches were prepazed by or under the direction <br />ofJames E. Stover, P.E. No. 19230. Designs for Sedimentation Pond Al, which replaced Pond A. <br />• <br />• <br />TR-43 2.05-32a Revised August 2003 <br />