Laserfiche WebLink
Section - 2.05.3 <br />TABLE 2.05.3-T1 <br />MINE FACILITIES SUMMARY <br />Facilit Descri tion'•~ Dimensions <br />Sedimentation Pond Al Re lacement Sedimentation Pond 0.13 acre-feet <br />Sedimentation Pond 6 Existin sedimentation pond 2.0 acre-feet <br />Sedimentation Pond C Existin sedimentation and 0.37 acre-feet <br />Sedimentation Pond D Existin sedimentation and 1.97 acre-feet <br />East Yard Pond Existin sedimentation and 0.28 acre-feet <br />Sub No. 3 Pond Existin sedimentation pond 0.16 acre-feet <br />Elk Creek Culvert Steel CMP culvert 3,050' x 9' diameter <br />Sedimentation Pond E Sedimentation Pond 1.74 acre-feet <br />Sedimentation Pond F Sedimentation Pond 0.16 acre-feet <br />Notes: 'Assume 12" thick reinforced concrete for slab foundation unless otherwise noted <br />Assume normal reinforcing and 6" thickness for all foundations except coal handling facilities. <br />For coal handling facilities, assume heavy reinforcing and 12" foundation thickness <br />MR_7g 2.05-11b Revised May 2006 <br />