My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-11-16_PERMIT FILE - C1996083A (2)
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2007-11-16_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:29 PM
Creation date
1/17/2008 1:40:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/16/2007
Doc Name
pg 2.05-1 to 2.05-58i
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />150-feet. Entry spacing will range from a minimum of 50-feet to a maximum <br />of 120-feet. Room and pillar panels will be developed off main and submain <br />entries with barrier pillars left for protection. Partial pillar recovery of all <br />workings and barrier pillars will go on to the extent allowed by safe mining <br />and surface protection concerns. <br />Main entries in both the D and B-Seams will be developed down dip in a <br />northerly direction. Submains will be extended both westerly and easterly <br />from the mains. Panels will be driven at =90 degrees from the submain <br />entries. Each set of panels will be separated from the adjacent panels and <br />submains by barrier pillars. <br />Longwall mining faces will be developed as long as possible and 800 to <br />1,000 feet wide. Gates entries will typically be developed with three entries <br />with pillar spacing and size designed to provide maximum support for <br />ventilation and belt haulage. Bleeder entries will be developed with four or <br />more entries. <br />• A fault bisects the private reserve in a northwest southeast direction. The <br />reserves on each side of the fault will be referred to as the east and west <br />pods. The D-Seam was initially developed in the east pod. The B-Seam <br />was initially be developed in the west pod. <br />The D-Seam west mains were advanced towards the fault. The operator <br />drilled three holes into the fault from the west mains. No significant water <br />was encountered in the fault. The fault was damp to dry. The west pod is <br />about 28-feet below the east pod. Three rock slopes were excavated at a <br />12% grade which resulted in the slopes being approximately 230 feet long. <br />Two 16-foot diameter shafts were excavated adjacent to the rock slopes to <br />improve ventilation. The rock excavated from this development was <br />permanently stored in rooms excavated specifically for that purpose. <br />Appropriate approvals were obtained from MSHA for both driving the slopes <br />and storing waste rock underground. <br />The D-Seam slopes were supported with roof bolts. No supplemental <br />support was necessary and no debris within the fault plane was encountered. <br />• <br />Permit Renewal ~ Z 2.05 - 4 - 12/06 <br />M r2-8b <br />A iPRovap <br />?~3 i/o <br />
The URL can be used to link to this page
Your browser does not support the video tag.