Laserfiche WebLink
...... <br />.: <br />FORBS : sheet 2 of 2 <br />Coreopsis, Lance Leafed Coreopsis lanceo/ata 1.00 Native NA 25.6 $49.35 <br />Daisy, Englemann's Englemannia pinnatif~da 1.00 Native NA 4.9 $197.40 <br />Golden Banner Thermopsis montanus 1.00 Native NA 0.7 $79.25 <br /> <br /> <br /> <br /> <br /> <br /> <br />SHRUBS AND TREES (seed) <br />Seed aDDlication -method :Drill seeding {OMG survey data) TOTAL SEED APPLICATION COST /ACRE : $74.78 <br />MULCHING and MISCELLANEOUS <br />Materials -item no. 1 <br />- item no. 2 <br />- item no. 3 <br />- item no. 4 <br />DESCRIPTION (data source) UNITS /ACRE UNIT ~ COST /UNIT COST /ACRE <br />Straw, delivered {DMG survey data) 2.00 ton $99.62 $199.24 <br /> <br /> <br /> <br />A~olication -method no. 1 : Power mulcher (MEANS 02910 500 0350) <br />-method no. 2 <br />- method no. 3 <br />TOTAL MULCH MATERU\LS COST /ACRE : $199.24 <br />$61.86 <br />TOTAL MULCH APPLICATION COST /ACRE : $81.86 <br />NURSERY STOCK PLANTIN G TYPE and SIZE MATERIAL PLANTING COST / FERT. TOTAL TOTAL <br />COMMON NAME NO. /ACRE (planting cost data source) COST /PLANT COST! PLANT PELLET COST /PLANT COST /ACRE <br />No nursery stock required <br /> <br /> <br /> <br /> <br /> <br /> <br />TOTAL NURSERY STOCK COST /ACRE : $0.00 <br />OB COS No. of acres : 0.20 Cost /acre : $999.45 INITIAL JOB COST : $199.89 <br />Estimated failure rate (percent) : 50.00% Cost I acre': $738.38 RESEEDING JOB COST : $73.84 <br />'Selected replanting work items : S TOTAL JOB COST : $274 <br />' TOTAL SEEDS / SO. FT.: 235.5 'TOTAL POUNDS PLS /ACRE : 21.00 'TOTAL SEED MIX COST /ACRE : $683.58 <br />