My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-28_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2007-09-28_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:01 PM
Creation date
1/17/2008 1:35:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
9/28/2007
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate MR82
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatins~ Software <br />PROJECT IDENTIFICATION <br />Task # : 232 <br />Date : 09/28/7007 <br />User : JRS <br />State :Colorado <br />County :Delta <br />Site :Bowie No. 2 Mine <br />Permit/job # : C-1996-083 <br />Abbreviation :none <br />Filename : C083-232 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Minor Revision 82 <br />Task description :Rip Rock Laydown Pad Topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series l1- 7SU Horsepower : 240 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic : NA NA Load factor <br />Area : 0.20 acres Rip depth (ft) <br />Selected estimating method : Area <br />NA Bank volume : NA BCY <br />2.00 Volume : 645 BCY or CCY <br />Source of estimated quantity :Operator Estimate <br />Source of estimated load factor :NA <br />_. <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br /> <br />Area : Avg. ripping depth : 2.45 feeUpass <br />Average ripping width : 6.50 feeUpass <br />Average ripping length : 25.00 feet/pass <br />Average dozer speed : 88.00 feeUminute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.419 acres/hour <br />Unadjusted production : 1,656.50 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unadjusted production <br />per selected method <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />1,656.50 cu. yds./hour <br />7,100 feet <br />1.00 (Cat HB) <br />0.83 (1 shift/day) <br />0.83 multiplier <br />Adjusted unit production : 1,374.90 cu. yds./hour <br />Adjusted fleet production : 1,374.90 cu. yds./hour <br />Total job time : 0.47 hours <br />Unit cost : $0.082 per cu. yd. Total job cost : $53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.