Laserfiche WebLink
Project: <br />~ ~ G EOTEC H Client / On Site Rep: <br />Bowie Resources - 8. Bear <br /> ~ /R <br />t <br />t <br />C <br />Bowie Mine Gob Pile Stability ep: <br />on <br />rac <br />or <br /> Load Out Services -Steve West <br />Project No: <br />2005126-CMT Date: <br />11/6/2007 CIVIL, STRUCTURAL & GEOTECHNICAL ENGINEERS <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br /> <br />B. Wilson <br />DAILY CO MPACTIO N REPORT <br /> LOCATION TEST TYPE MAX. RY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB <br />TEST <br /> <br />NUMBER <br />Compacted Embankment <br /> <br />Gob Pile No. 4 GRADE ELEV <br /> <br />NUC <br /> <br />SAND <br />DENSITY <br /> <br />(pcf) <br />MOISTURE <br /> <br />CONT. (%) <br />DENSITY <br /> <br />(pcf) <br />CONTENT <br /> <br />(%) <br />COMPACTION <br />WITHIN <br /> <br />SPEC <br />TYPE <br />SAMPLE <br /> <br />NUMBER , <br />169 (PT#4247 N19361,6950/E36109.3770 6164.5 X 92.4 8.0 71.2 18.3 77,6 X gob 4230/31r/c @32°Yo <br />170 PT#4248) N19364.9080/E36338.2880 6163.6 X 94.2 9.8 93.8 8.0 94.2 gob 4230/31r/c @19% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE /DENSITY SPECIFICATTONS OBSERVATION /TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Tcme: ~ Day: S M T <br />X W Th F S <br />Sheepsf°ot: <br /> Part Time: ~ Weather: Sun Clear Overcast Rain Snow <br />pecified X X X Smooth Drum Roller: <br />Moisture Cohesive Soils X <br />Requirement: n/a Cohesionless Soils Number of Site Visits/Day: ~ Temp: To 32 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only: ~ Wind: Still Mod High <br /> Requested By (Company Name): X X Other (List Below): 0 <br />Laboratory Testing ASTM 698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Bowie Resources <br /> <br />B. Bear Humidity: Dry <br /> <br />X Mod Humid Haul Traffic <br />DENSITY / COMPACTION TESTFNG WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount of <br />material plated. Informed (Rep of Company) of Test Results: <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />Contractor Not Working Due To: The Contractor Is: contractor would not be working <br /> <br />FrtCiement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: Processing Wet Material: <br /> <br />smvving and/or Grubbing: Moisture Conditioning Dry Maul: Field Copies Given To: <br /> <br />Contractor. <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: Removing Unwitable Mat'I: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.xlsflCR11-06-07rw#169-sj <br />